Final modification on the flexible circuit and the labview program for allowing also the calibration of the TDC and QDC with the same trigger and minimising cabling rearrangements. 

Discussion on the final experience and specific assignments to the groups.  

Ultime modifiche: mercoledì, 27 maggio 2026, 18:58